Description:
The wastewater treatment plant was built in Katerini (population: 84,000) to treat the city's entire sewage volume.
Products Used:
Due to concern about possible leakage through the cold joints in the concrete, over 3,000m of PENEBAR SW 45 with PENEBAR PRIMER was installed as a waterproofing barrier to prevent seepage. PENETRON was also applied to waterproof 26,000m2 of concrete.
© 2018 Penetron Hellas - Privacy Policy/GDPR / Terms of use - Site Map