PENETRON AROUNT THE WORLD

Over the past 40 years, the PENETRON system of products has helped our customers undertake and complete ambitious and challenging projects – from hospitals to parking garages, bridges to tunnels, water treatment plants to military installations… and on and on.

To get a closer look at some of our projects, simply click on a project or choose a country or specific category on the left.

Please contact your PENETRON representative if you need additional project details. You will learn how PENETRON enables successful projects around the world.

Talkatora Stadium

Additional Info

New Dehli, India

Description:
Totally renewed for the Commonwealth Games with PENETRON concrete waterproofing technology, the year-long renovation project included a complete renovation of the Olympic-size racing and diving pools and addition of a new warm-up pool below the stands.  The Talkatora Stadium now conforms to international standards and seating capacity was also increased to accommodate 5,000.

Products Used:
A total of 5,084m2 of pool concrete surface was treated with PENETRON, 316m3 of concrete treated with PENETRON ADMIX were used during the reconstruction of the existing pools and the new warm up pool.  A total of 2,043 meters of existing construction joints were repaired with PENECRETE MORTAR; PENEBAR SW-45 was used for 360 meters of new construction joints and around pipe penetrations.

Suria Jelutong

Additional Info

Shah Alam, Selangor, Malaysia

Description:

Located in Shah Alam, the state capital of Selangor, Suria Jelutong is a mixed development project located in the upcoming commercial center of Bukit Jelutong – an attractive address in popular Shah Alam, adjacent to the Bukit Cahaya Forest Reserve.

Products Used:
To protect the entire foundation against water penetration and concrete deterioration, 6,500m3 of concrete were treated with PENETRON ADMIX; all construction joints were sealed with PENEBAR SW-55 waterstops.

Supertech E Square

Additional Info

Noida, India

Description:

The design of this commercial center features an open atrium and passages for the smooth flow of shoppers and attractive business areas for retailers.  The building is located between the Noida Express Highway and the Jaypee Greens park area, and surrounded by two hotels and various residential buildings.   The waterproofing needs of the project encompassed three levels and the basement.

Products Used:
PENETRON ADMIX was used to cover a 7,750m2 area, including the basement and three above-ground levels.

Sunway Nexis

Additional Info

Kota Dmansara, Petailing Jaya, Malaysia

Description:
Sunway Nexis is a mixed development with commercial and residential areas: a 3-storey retail building (Nexis Shoppe), a 13-storey commercial tower (Nexis Biz Suite) and a 20-storey small home/office building (Nexis Flexi Suite). All buildings feature a 2-level basement parking garage. The development also offers health and fitness facilities, lush landscaping and green “backdrops” visible from most of the units.

Products Used:
A certified green product, PENETRON ADMIX was used to protect 4,800m3 of basement concrete and a total of 1,100 meters of PENEBAR SW-55 were installed to seal construction joints.

Summerville “Cannibal” Sludge Reduction Project

Additional Info

South Carolina, USA

Description:
The facility expansion and new system additions to the waste water treatment plant in Summerville, South Carolina included a new screenings facility and RAS/IAS pump station.

Products Used:
PENETRON ADMIX was specified for the entire structure of the new pump station wet well, base slab of the clarifier tank and the floor and retaining walls of the screenings building. With these facility additions and changes, the Public Works department will realize an initial annual savings of approximately $350,000 per year.

Statue of Liberty

Additional Info

New York, NY, USA

Description:
Located in New York Harbor, the Statue of Liberty is one of the most universal symbols of political freedom and democracy. Dedicated in 1886, it was extensively restored for her centennial. Even with a heating system installed in 1949, the moist air coming off the ocean successively saturated the walls of the pedestal, leading to deterioration of the structure and its fixtures.

Products Used:
The PENETRON System was applied during the restoration, eliminating the moisture problems. The underground vaults and utility rooms were also treated.

Page 6 of 31

Tag

Countries

All in one search

 

 

News Letter Registration

Subscribe to the Newsletter of PENETRON INTERNATIONAL and stay informed with the latest news on waterproofing and concrete protection (in English).