Description:
More than an air transportation hub, the Changi Airport is a symbol of national pride and a benchmark for service excellence. Terminal 3 features innovative passenger facilities and modern architecture.
Products Used:
140,000 m3 of concrete was treated with PENETRON ADMIX, along with PENETRON slurry and PENECRETE MORTAR.
Description:
The Seri Hening Residence is a high-rise condominium located in Kuala Lumpur. There are 113 units housed within 6 blocks; the facility also includes a gym, swimming pool, wading pool, tennis court, jogging track, sauna, aerobics room, barbeque areas, Koi pond and car park.
Products Used:
The PENETRON System was used to protect the entire basement of the building.
Description:
Seabrook is a 1,160-megawatt (net) pressurized-water nuclear reactor that provides enough electricity for about 1,000,000 homes. Located two miles inland from the New Hampshire coast, the plant uses water that is carried from the ocean to the plant via two three-mile-long underground tunnels.
Products Used:
PENETRON, PENECRETE and PENEPLUG. The underground tunnels, together with the plant foundations, underground facilities and all protective spillways were treated with the PENETRON System. In addition to the waterproofing and chemical resistance that protects the concrete, an additional benefit is a significant reduction in gamma radiation in case of an accident.
Description:
As a summer tourist destination, the Schroon Lake wastewater system often sees widely varying flows during the year. A system upgrade saw the demolition and replacement of existing structures and the construction of expanded facilities: aeration basins, clarifiers, a new process building and complete sludge removal system.
Products Used:
The PENETRON System was chosen as the concrete waterproofing material for this project.
Description:
Sayano Shushenskaya is the largest hydroelectric power station (6,400 megawatt capacity) in Russia with the third largest dam (240m high and 900m wide) in the world. The renovation project faced a typical problem: severe deterioration of the steel reinforcements in the concrete.
Products Used:
The PENETRON System was used to repair the powerhouse cable sections, the reinforced concrete elements throughout the project and various other sections, including the flood-gates.
Description:
To eliminate over 1,000 malfunctioning sewer systems and 10 dilapidated sewage treatment plants, the Saxonburg Area Authority completed a project that include a new 2.05 million gallons/day treatment plant, multiple sanitary sewer pumping stations and approximately 90 miles of sanitary sewers throughout numerous municipalities.
Products Used:
PENETRON ADMIX was used to waterproof 3 cast-in-place pumping stations pump sewage between multiple drainage basins. They are designed to work 15 to 25 feet below the ground water level at the project area. The waterproof design of the pump stations was critical because they are in close proximity to low lying wetlands and environmentally sensitive watersheds.